Binghamton Mayor Rich David is going to begin seeking bids to reconstruct Riverside Drive between Front and Beethoven Street on the city’s west side. The project will call for reconstruction of water, sewer, sanitary lines, and curbs. Road work is expected to run from June through November, with more work likely continuing into next year. A top coat will be applied to that stretch of road in the meantime to prevent further deterioration.
Loading advertisement…
Loading advertisement…
Latest Local News
Historic train caboose moved to Troy museum
A historic train caboose that has sat on a... Read More.
Van Etten man arrested after allegedly driving nearly 100 MPH with ghost gun
A Van Etten man was arrested over the weekend... Read More.
Local disc golf event raises money, food for Tioga County Rural Ministry
The seventh annual Greater Binghamton Disc Golf Club Ice... Read More.
New York DMV locations to be closed for several days this month
All New York State Department of Motor Vehicle locations... Read More.
Previous
Next












